| TAU | INT | ∆ INT–TAU | p ∆a | ICUR |
---|---|---|---|---|---|
mean | mean | (se)a | point estimate | ||
(sd) | (sd) | ∆Cost/∆QALY | |||
Annual average costs year 1 + 2 | 3784.59 (8581.11) | 3264.44 (9431.89) |  − 516.14 (1124.95) | 0.647 | € − 139.49 |
Annual average QALY year 1 + 2 | 0.759 (0.073) | 0.763 (0.072) | 0.0037 (0.0092) | 0.685 | |
Cost year 1 | 3723.22 (9241.54) | 3387.0 (8816.41) |  − 336.2 (1118.62) | 0.764 | € − 105.06 |
QALY year 1 | 0.759 (0.068) | 0.762 (0.066) | 0.0032 (0.0087) | 0.709 | |
Cost year 2 | 3845.95 (9819.97) | 3149.90 (10,818.59) |  − 696.05 (1267.75) | 0. 7584 | € − 248.59 |
QALY year 2 | 0.760 (0.068) | 0.763 (0.067) | 0.0028 (0.0088) | 0. 751 |